National Highways Dartford road closures

Two of these closures are expected to cause delays of between 10 minutes and half an hour, with the rest predicted to result in minimal disruption.

The closures are part of ongoing maintenance and improvement projects aimed at ensuring the safety and efficiency of major routes in the area.

Drivers are advised to plan their journeys accordingly and follow diversion routes where indicated.

National Highways has emphasised that smaller road closures are not included in their schedule, so it’s also worth checking local updates for additional disruptions.

With delays likely to affect some of the busiest routes in the area, taking alternate routes or adjusting travel times may help minimise inconvenience.

Here’s a breakdown of the closures to watch out for:

  • January 4 to January 5: The A282 northbound Dartford Crossing West Tunnel will be closed from 10pm to 5am for maintenance works. Slight delays (under 10 minutes) are expected, with a diversion via the National Highways network.
  • January 5 to January 6: The A282 northbound Dartford Crossing East Tunnel will undergo maintenance, with closures from 10pm to 5am. Slight delays (under 10 minutes) are anticipated.
  • January 6 to January 7: Sign works on the A2 westbound between Dartford Bypass and the M25 anticlockwise at Darenth will result in lane and slip road closures from 10pm to 5:30am. Moderate delays (10-30 minutes) are expected, with diversions in place.
  • January 6 to February 1: Tunnel works on the A282 northbound, junction 1a to the West Tunnel, will result in carriageway and slip road closures from 10pm to 6am nightly. Moderate delays (10-30 minutes) are likely.
  • January 6 to January 9: Cabling works will lead to lane closures on the A282 southbound between junctions 31 and 1A from 10pm to 5am. Slight delays (under 10 minutes) are expected.
  • January 11 to January 12: Contraflow works at the Dartford Crossing will close the A282 northbound tunnel from 9:30pm to 5am. Additional maintenance on the West Tunnel and QEII Bridge will also occur during this period. Slight delays (under 10 minutes) are expected.
  • January 12 to January 13: The A282 northbound East Tunnel will be closed from 10pm to 5am for maintenance. Slight delays (under 10 minutes) are anticipated.
  • January 13 to January 16: Drainage works on the A2 at Ebbsfleet will result in lane closures in both directions from 8pm to 6am. Slight delays (under 10 minutes) are expected.

 

Image Credits and Reference: https://www.newsshopper.co.uk/news/24826458.national-highways-dartford-road-closures/?ref=rss

Leave a Comment